HMRC_1920_x_900_(2).png

IWTM-UK’s chemical-free water treatment technology was incorporated into the building services installation at Pilgrim’s Quarter, Newcastle, the new regional centre for HM Revenue & Customs (HMRC).

The 463,000 sq ft (approximately 43,000 m²) development will accommodate around 9,000 HMRC staff, making it the department’s largest regional centre in the UK. Located within Newcastle’s Pilgrim Street regeneration area, the building forms part of a major city-centre redevelopment that integrates new office accommodation with the historic façade of the Grade II listed Carliol House.

The project reached practical completion of its base build in December 2025, enabling HMRC to progress its Category B fit-out ahead of planned occupation in 2027.

Derry Building Services delivered the building services installation, which incorporated IWTM-UK’s Protector® and ProFill® technology to provide chemical-free water treatment for the building’s mechanical systems.



Project Overview

IWTM-UK’s chemical-free water treatment technology was incorporated into the building services installation at Pilgrim’s Quarter in Newcastle, the new regional centre for HM Revenue & Customs (HMRC).

The 463,000 sq ft (approximately 43,000 m²) development will accommodate around 9,000 HMRC staff, making it the department’s largest regional centre in the UK. Located within Newcastle’s Pilgrim Street regeneration area, the building forms part of a major city-centre redevelopment that integrates new office accommodation with the historic façade of the Grade II listed Carliol House.

The project reached practical completion of its base build in December 2025, enabling HMRC to progress its Category B fit-out ahead of planned occupation in 2027.

Derry Building Services delivered the building services installation, with Banyards acting as the Commissioning Authority on behalf of the client. The installation incorporated IWTM-UK’s Protector® and ProFill® technology to provide chemical-free water treatment for the building’s mechanical systems.
 

Project: HMRC Pilgrim’s Quarter
Location: Newcastle upon Tyne
Building area: 463,000 sq ft (approximately 43,000 m²)
Planned occupancy: Approximately 9,000 HMRC staff
Developer: Reuben Brothers (Newcastle) Limited
Main contractor: Bowmer & Kirkland
Lead architect: Ryder Architecture
Engineering consultant: Cundall
Building services contractor: Derry Building Services
Commissioning Authority: Banyards
Water treatment: IWTM-UK

 

 

The Requirement

The building services installation incorporated multiple circuits, including low temperature hot water (LTHW), chilled water (CHW), domestic hot water (DHWS) and a kitchen air source heat pump (ASHP) circuit. 

Dissolved oxygen can contribute to corrosion within closed-loop systems, while unsuitable pH and elevated electrical conductivity can increase corrosion risks. As corrosion develops, the resulting debris can circulate through the network and accumulate in system components.

The water treatment strategy therefore needed to address dissolved oxygen, pH, electrical conductivity and circulating contaminants. It also needed to provide an alternative to conventional treatment methods that rely on routine chemical inhibitor dosing.

The IWTM-UK Solution

The installation incorporated a combination of IWTM-UK Protector® units, selected to meet the requirements of the building’s different circuits. This included a Protector P120 for the fan coil units (FCUs), P45 for the low temperature hot water (LTHW) system, P10 for the domestic hot water (DHWS) system and P2 for the kitchen air source heat pump (ASHP) circuit.

Together with ProFill® demineralisation technology, this combination provides a tailored chemical-free water treatment solution across the building’s mechanical systems.

Protector® – Electrochemical Water Treatment

The IWTM Protector uses sacrificial magnesium anodes to remove dissolved oxygen from circulating system water through electrochemical reactions. The process supports pH management and creates water conditions designed to minimise corrosion within the closed-loop system.

The Protector also incorporates filtration and magnetic separation to capture circulating contaminants, including corrosion debris. This combines electrochemical treatment with the removal of material already present in the system water.

ProFill® – Demineralised Filling and Make-Up Water

IWTM ProFill provides demineralised filling and make-up water, reducing the concentration of dissolved salts introduced into the system.

Controlling the electrical conductivity of incoming water is an important part of the overall treatment strategy, particularly where additional water is introduced during filling or subsequent make-up.

By combining Protector and ProFill technology, the installation addressed dissolved oxygen, pH, electrical conductivity and circulating contaminants without relying on routine chemical inhibitor dosing. The treatment strategy was designed to support water quality management in accordance with VDI 2035 and CSA TM20. 

Project Outcome

The installation incorporated IWTM-UK’s electrochemical treatment and demineralisation technology into the building services infrastructure at Pilgrim’s Quarter.

Protector and ProFill provide complementary treatment functions: the Protector treats circulating system water and removes contaminants, while ProFill controls the quality of filling and make-up water entering the systems.

Together, the technologies provide a chemical-free water treatment strategy designed to maintain water quality and minimise corrosion risks as the building enters operation.

The project demonstrates how chemical-free water treatment can be integrated into the mechanical services of a large commercial development from the outset, supporting the long-term protection of its heating and cooling infrastructure.